Tororo Solar PV project (10 MW), Tororo, Uganda

Rividco Scope: Solar modules, Inverters installation, DC and AC cable installation, Including 33kV cable termination.
Read More

Bukinda Hydro Power Project (6.5 MW), Kagadi, Uganda

Rividco Scope: Concept design and installation of the electrical system. Including 6.3 kV and 33kV cable termination.
Read More

Electrical safety audit and testing of Jacobi Carbons, Naththandiya

Inspection and testing of electrical system of the plant.

Scope of work:Inspection and testing of electrical system of the plant.
Read More

Hangout Solar PV project, Kurunegala

Thermal Imaginary Survey and reporting

Scope of work:Thermal Imaginary Survey and reporting
Read More

Woodfeather rooftop solar, Yatiyanthota, Sri Lanka

Design, implementation inspection, testing and commissioning

Scope of work:Design, implementation inspection, testing and commissioning Capacity : 150 kWp
Read More

Technical, social and environment due diligence of operational mini hydro power plants

Due diligence of three hydro projects

Scope of work:Due diligence of three hydro projects Capacity : Three projects with capacities of 3 MW, 2.4 Mw and 3.5 MW
Read More

Nahalwathura mini hydro project, Kahawatta, Sri Lanka

Feasibility study – Capacity expansion from 400 kW to 600 kW

Scope of work:Feasibility study – Capacity expansion from 400 kW to 600 kW.
Read More

Weswin mini hydro project, Kalawana, Sri Lanka

Draft tube refurbishment work

Scope of work:Draft tube refurbishment work. Due to problem of draft tube, the plant was not running for several months.
Read More

Denipili Oya mini hydro project, Kithulgala, Sri Lanka

Installation of turbine, generator, transformer, control panels, LV and MV panels and power and control cabling

Scope of work:Installation of turbine, generator, transformer, control panels, LV and MV panels and power and control cabling. Capacity : 1,100 kW Turbine type : Peltone from Gugler_Austria Head : 120 m Design Flow : 1.05 m3/s
Read More

Mossville mini hydro project, Gampola, Sri Lanka

Mossivlle mini hydro project is a unique project without conventional spill way.

Scope of work: Consultancy on electromechanical equipment (Turbine, generator, control system, LV and MV switch yard and transformer) Mossivlle mini hydro project is a unique project without conventional spill way.In case of shut down, Turbine spears has been programmed to freeze at running position to pass water through the turbine itself. Capacity : 900 kW