
Bukinda Hydro Power Project (6.5 MW), Kagadi, Uganda
Rividco Scope: Concept design and installation of the electrical system. Including 6.3 kV and 33kV cable termination.
Due diligence of three hydro projects
Feasibility study – Capacity expansion from 400 kW to 600 kW
Draft tube refurbishment work
Installation of turbine, generator, transformer, control panels, LV and MV panels and power and control cabling
Mossivlle mini hydro project is a unique project without conventional spill way.