
Tororo Solar PV project (10 MW), Tororo, Uganda
Rividco Scope: Solar modules, Inverters installation, DC and AC cable installation, Including 33kV cable termination.
Inspection and testing of electrical system of the plant.
Thermal Imaginary Survey and reporting
Design, implementation inspection, testing and commissioning
Due diligence of three hydro projects
Feasibility study – Capacity expansion from 400 kW to 600 kW
Draft tube refurbishment work
Installation of turbine, generator, transformer, control panels, LV and MV panels and power and control cabling
Mossivlle mini hydro project is a unique project without conventional spill way.